ASHRAE Standing Guideline Project Committee 0 (SGPC 0)
The Commissioning Process

HOME

Continuous Maintenance Information | Meetings/Minutes | The Committee | Work in Progress

Welcome!

SGPC0 is responsible for maintaining and revising ASHRAE Guideline 0: 
The Commissioning Process. The purpose and scope of this guideline are:

1. PURPOSE

1.1 The purpose of this guideline is to describe the Commissioning Process that will verify that the facility and its systems meet the Owner’s Project Requirements.

2. SCOPE

2.1 The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from pre-design through occupancy and operation without regard to specific elements, assemblies, or systems, and provides the following:

    a) overview of the commissioning process activities, b) description of each phase’s processes, c) requirements for acceptance of each phase, d) requirements for documentation of each phase, and e) requirements for training of operation and maintenance personnel.

2.2 These Commissioning Process Guideline Procedures include the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in their Commissioning Process Guideline 0.

To submit a change proposal, click the Continuous Maintenance link to the right. To become involved with the committee contact the Committee Chair (see link below). To review recent committee activities click the Minutes link to the right.

Project Committee Chair: Jeff Traylor, jeff.traylor@verizon.net

Next Meeting: 2006 ASHRAE Annual Meeting, Quebec City, QB, Saturday, June 24, 2006. 